top of page

SCOTT MILLER: PROJECTS

Click here for CV & ABOUT ME

© 2017 Scott Miller/MAKE COLLECTIVE

1:20 Spectrum, Formally Renault Building, Swindon UK

Detail Architectural Model

Degree Major Project

Best Architectural Model,

New Blades 2011

This project aimed to demonstrate the practicalities within the design of Foster's Renault building. The model was built in section exactly as the full scale building is allowing it to assembled in the same manner using nuts and bolts to fix components in place.

To see a time lapse assembly video of this model visit the 'Videos' page or click here.

This model was constructed from CAD drawings converted into laser cut components alongside hand made detailing and finishing.

This model was voted best Architectural Model in Show at New Blades annual modelmakers recruitment fair 2011 sponsered by Foster and Partners Architects.

bottom of page